9) In the network shown in Fig. (15 fig) the latest start time of an activity 4-5 is
Answer is:
4
Related Structural Engineering II MCQ with Answers
Answer is:
both activities 2—3 and 4—6 are completed
Answer is:
3.5 and 25/36
Answer is: